FACILITY NORTH // INTERACTIVE CROSS-SECTION
Click any room.
A schematic of Facility North’s above- and below-ground plant. Rooms with surface labels are publicly accessible. Rooms in the lower tiers require clearance. Click a room for a brief.
SCALE NOTE
Why the corridor is too long.
The Corridor on this schematic is drawn to its blueprint length (1,200 px). Operators report measuring it at 1,847 px. The Bureau accepts both measurements. Architect 047 has filed a Form 847-B every six weeks since 2019.
